PT. Puta Turbo Indonesia

About us

Our team is passionate about what we do, and we are committed to providing the best quality for our customers.

Core Value

Accountability

We take responsibility for our actions and results.

Excellence

We are dedicated to providing top-tier consultation services.

Integrity

We maintain high ethical standards.

Mission

Develop Human Resources, processes and facilities to produce high quality

Our mission

Become a best company in the field of rotating services, mechanical and engineering.

Our Experiences

    PT. Supreme Energy

    PT. Meppogen

    PT. Rekind Daya Mamuju

    PT. PLN Indonesia Power

    PT. Voith Hydro Indonesia

    PT. PLN Indonesia Power Service

Provision of SWS Pump Overhaul

January 2024 - March 2024

PLTP Rantau Dedap

PT. Supreme Energy Rantau Dedap

 

Job Description

  • Major Overhaul SWS Pump 5B
  • Major Overhaul & Fabrication Part

Provision of SWS Pump Overhaul

October 2024 - November 2024

PLTP Rantau Dedap

PT. Supreme Energy Rantau Dedap

 

Job Description

  • Major Overhaul SWS Pump 7
  • Major Overhaul & Fabrication Part

Provision of SWS Pump Overhaul

May 2024 - June 2024

PLTP Rantau Dedap

PT. Supreme Energy Rantau Dedap

 

Job Description

  • Manufacture Bearing Housing & Coupling Pump

Serious Inspection Unit #1 & #2

February 2024 - May 2024

PLTU Mamuju 2 x 25 MW

PT Reking Daya Mamuju

 

Job Description

  • Boiler Feed Water Overhaul
  • Consendate Pump
  • Vacuum Pump
  • All Boilder Fan & Expantion Joint

Repair of Sliding Ring of Semangka HEP

July 2024

PT. Vioth Hydro Indonesia

Short Inspection

June 2024 - July 2024

PLTGU Gunung Megang 35 MW

PT. Meppogen

 

Job Description

  • Steam Turbine
  • Reduction Gear
  • Generator
  • Condenser Pump B

Recovery Services and Part of Turbine Repair #2

October 2024 - November 2025

UBP PLTU Berau 2 x 7 MW

PT Indonesia Power Services

 

Job Description

  • Steam Turbine Overhaul
  • Manufacturing turbine parts

Revitalization Blade Last Stage Service #2

March 2025

UBP PLTU Berau 2 x 7 MW

PT Indonesia Power

 

Job Description

  • Perform Cutting to All Last Stage Blade until near of Disc Inspection of Height of Remaining Blade

Recovery Services and Part of Turbine Repair #2

October 2024 - November 2025

UBP PLTU Berau 2 x 7 MW

PT Indonesia Power Services

 

Job Description

  • Steam Turbine Overhaul
  • Manufacturing turbine parts

Recovery High Vibration Turbine Generator #2

June 2025 - July 2025

UBP PLTU Berau 2 x 7 MW

PT Indonesia Power Services

 

Job Description

  • Stubbing Shaft
  • Welding Build Up ID Disc Curtis, Machining on Site & Stacking
  • Reblading Blade Curtis
  • On Site Balancing

Meet the Team

David M Asri

david@putaturbo.com

Ego Viasiska

ego@putaturbo.com

Aldi Chandra

aldi@putaturbo.com

Teguh Agusta

teguh@putaturbo.com